Aitos/Bulgaria Landfill Site Rehabilitation Project

For the Aitos rehabilitation project, a flare with a capacity of 50 Nm3/h was installed and commissioned.
  • Product
  • Capacity
    50 Nm3/h
  • Customer
    ProStream Technik
  • Year
    2020
  • Location
    Aitos/Bulgaria

About The Plant

Thanks to this facility, which was established in the Aitos region of Bulgaria, pollution of groundwater by landfill leachate was prevented and environmental damage such as greenhouse gas emissions as a result of the rehabilitation of unsanitary disposal was minimized.