Sakarya Biogas Regenerative Siloxane Removal System

The establishment of the 1st Stage of the Regenerative Siloxane Removal System with a capacity of 2,500 Nm3/h was completed for Sakarya Landfill Gas Electricity Generation Plant.
  • Product
  • Capacity
    2.500 Nm3/h
  • Customer
    Sakarya Entegre Katı Atık Yönetimi A.Ş. (SEKAY)
  • Year
    2022
  • Location
    Sakarya

About The Plant

The Integrated Solid Waste Management Facility, built at an investment cost of $70 million in the Erenler district of Sakarya province, is located on an area of 20 hectares and has an installed capacity of 14 MW. Sakarya Integrated Solid Waste Management Facility converts approximately 700 tons of domestic solid waste per day to meet the electricity needs of 130-140 thousand people per year.