Edirne Landfill Gas Regenerative Siloxane Removal System

The 1st Stage of Regenerative Siloxane Removal System with a capacity of 1,400 m3/h was commissioned for the Edirne Landfill Gas Power Plant.
  • Product
  • Capacity
    1.400 Nm3/h
  • Customer
    Atlas İnşaat San. Tic. Ltd. Şti.
  • Year
    2020
  • Location
    Edirne

About The Plant

The Integrated Solid Waste Management Facility, built at an investment cost of TL 65 million in kocayusuf village of Edirne, has an installed capacity of 3.2 MW. Approximately 250 tons of domestic solid waste are converted daily in the integrated Solid Waste Management Facility and 30,000 households’ electricity needs are met annually.